Technical reference

Example decision library

Seven field-accurate trade studies for Genius — deterministic scoring, human approval, audit-ready output.

7 worked examplesLive UI field syncv1.3
  • 7 worked examples
  • Field-accurate
  • Copy-paste ready
Structured reference examples for trade studies
Deterministic engineWeighted criteria

Same packet → same rank. Reproducible scoring matrix.

Human approval gateAccept · Override · Revise

AI advises; you record the authoritative call.

Audit recordScorecard → Brief → Receipt

Immutable trail for board, legal, and diligence.

Onboarding

Your first governed decision (~15 min)

Follow these steps for a complete trade study with audit-ready output.

  1. 0
    Inspect a finished decision

    See ranking, why the runner-up lost, and a hashed receipt — no sign-in.

    Go →
  2. 1
    Start this trade

    Open the Harbor CRM packet you inspected. Community is manual-only; Founding Pilot adds AI assist.

    Go →
  3. 2
    Complete options & criteria

    Add 2–7 options, weights that sum to 1.0, and scores 0–100.

    Go →
  4. 3
    Pass readiness gates

    Resolve blocking items on the readiness panel before scoring.

    Go →
  5. 4
    Score, review, finalize

    Deterministic ranking → critique → brief → human ACCEPT/OVERRIDE/REVISE.

    Go →
  6. 5
    Export audit trail

    PDF on all tiers; Founding Pilot audit bundle with integrity digest (HMAC when configured).

    Go →

Packet architecture

Seven steps · one scoreable matrix

Each step maps 1:1 to Genius navigation. Complete all seven before Run score.

  1. GoalProblem · Explore
  2. OptionsPrepare
  3. ConstraintsPrepare
  4. CriteriaEvaluate
  5. ScoresEvaluate
  6. AssumptionsPrepare · Evaluate
  7. ReviewApprove

After Genius

Score → brief → record

Packet completeness unlocks scoring. Every downstream step preserves provenance.

  1. EngineRun scoreDeterministic rank
  2. EvaluateScorecardOption matrix
  3. ProCritiqueAI review (optional)
  4. ApproveBriefExecutive summary
  5. HITLAccept · Override · ReviseHuman gate
  6. CommitFinalizeLock record
  7. ReceiptAuditExport bundle

Catalog

Seven worked trade studies

Field-accurate copy for Genius. Select by complexity, margin, or governance path.

Field sync

Genius — live UI mapping

Labels below are generated from production Genius. When the UI changes, this table updates automatically.

StepNavWhat you fill in
DraftStart screenTitle, optional Template (optional) Start
1GoalWhat are you deciding?, Background (optional), Decide by. Advanced: Decision type, Governance level
2OptionsPer option: Name, Trust in scores, Notes (optional). Add option / Remove (2–7; 3–5 ideal)
3ConstraintsAdd constraint for must-haves, or Next to skip
4CriteriaPer row: Name, Weight, Notes (optional). Weights sum to 1.00
5ScoresScore (0–100), optional Why? (optional)
6AssumptionsKey assumption, What would prove you wrong?, Best evidence, Top risk, Mitigation (optional)
7ReviewDecision window, Outcome confidence, Check again in (days), What success looks like (optional)

Footer: Back · Next · Save draft · Run score Run score appears when the packet is 100% complete.

Trust in scoresPick any quick level first (High — strong evidence, Medium — reasonable estimate, Low — mostly guesswork, or Not sure). The full preset list appears next — set the value from the guide table (e.g. High (0.8) or Custom… → 0.75).

Quick picker: High — strong evidence; Medium — reasonable estimate; Low — mostly guesswork; Not sure. Then presets: Very low (0.2), Low (0.4), Moderate (0.6), High (0.8), Very high (1), or Custom….

Decision window — choose 30 days, 60 days, 90 days, 6 months, 1 year, or Custom… and enter a value like 18_months.

Governance level Standard, Consulting, Enterprise. Standard allows 2 criteria; Consulting and Enterprise expect fuller packets.

Seven worked examples for /decisions/new. Each lists exactly what to enter on each Genius step screen.

Leave Template (optional) on Blank trade study unless an example says otherwise.

Autosave: Progress saves on every step. Use Save draft or return via Home → Your drafts → Continue.

Between steps: Footer actions are Back, Next, and Save draft. Run score appears on Review when the packet is 100% complete.

Trust in scores (Options step): Pick any quick level first (High — strong evidence, Medium — reasonable estimate, Low — mostly guesswork, or Not sure). The full preset list appears next — set the value from the guide table (e.g. High (0.8) or Custom… → 0.75).


Example 14 optionsClear winner

Analytics platform vendor

Best for: Full trade study; strong Accept path.

Expected: Amplitude or Looker leads with clear margin → **Accept** on the brief.

Draft

FieldValue
Decision typeVendor / procurement
Template (optional)Blank trade study
TitleQ3 Analytics Platform Vendor Selection

Click Start.

1

Goal

Open Advanced on this step.

UI fieldValue
What are you deciding?Select the analytics platform we will standardize on for product, marketing, and finance reporting through FY2027.
Background (optional)Current Mixpanel + spreadsheets fragment metrics. Need SSO, warehouse-native queries, and under $120k ARR Year 1. Evaluation committee: Product, Data, Finance.
Decide by2026-07-15
Decision typevendor
Governance levelConsulting

Click Next.

2

Options

The Genius starts with two empty option rows. Click Add option twice (4 options total).

For each option, set Name, Trust in scores, and Notes (optional):

#NameTrust in scoresNotes (optional)
1AmplitudeHigh (0.8)Strong product analytics; weaker finance cubes
2Looker (Google)High (0.8)Warehouse-native; heavier admin burden
3Metabase CloudCustom → 0.75Low cost; limited enterprise governance
4HeapModerate (0.6)Auto-capture; privacy review pending

Click Next.

3

Constraints

No constraints required for this example. Click Next (or Add constraint if you have must-haves).

4

Criteria

The Genius starts with two empty criteria rows. Click Add criterion twice (4 total). Set weights to sum 1.00 (watch the Total pill).

NameNotes (optional)Weight
Business impactRevenue/retention insight quality0.35
Implementation feasibilityTime-to-value ≤ 90 days0.25
Total cost of ownership3-year TCO0.25
Security & complianceSOC2, data residency0.15

Click Next.

5

Scores

Fill each card — Score (0–100) and optional Why? (optional). Enter every score before Run score (unscored cards block ranking).

OptionBusiness impactImplementation feasibilityTotal cost of ownershipSecurity & compliance
Amplitude88827085
Looker (Google)85687290
Metabase Cloud72909265
Heap80757870

Example Why? (optional) (Amplitude / Business impact): Strong product analytics depth.

Click Next.

6

Assumptions

UI fieldValue
Key assumptionWarehouse (Snowflake) remains our system of record.
What would prove you wrong?A warehouse migration RFP launches in Q4.
Best evidenceVendor demo scorecards (June 2026)
Top riskHeap privacy auto-capture — Severity 3 Likelihood 3
Mitigation (optional)Complete privacy review before shortlist cut

Click Next.

7

Review

UI fieldValue
Decision window90 days
Outcome confidenceCustom → 0.78
Check again in (days)90
What success looks like (optional)Platform live for 2 squads; dashboard adoption >60% of PMs.

Click Run score when the packet shows 100% complete.


Example 23 optionsNarrow margin

Cloud deployment model

Best for: Close call; weak winner margin; possible **Override**.

Expected: EKS vs multi-cloud within a few points — review rank stability on the scorecard.

Draft

FieldValue
Decision typeArchitecture / technical
TitleProduction Deployment Strategy FY2027

Click Start.

1

Goal

UI fieldValue
What are you deciding?Choose how we run customer-facing APIs in production for the next 18 months.
Background (optional)Team of 8 engineers; 99.9% SLA; EU data residency for some tenants. Debated 3 weeks without convergence.
Decide by2026-08-01
Decision typearchitecture
Governance levelConsulting
2

Options

Click Add option once (3 options total).

#NameTrust in scoresNotes (optional)
1Stay on AWS EKSHigh (0.8)Current state; known ops pain on upgrades
2Fly.io + managed PostgresModerate (0.6)Faster deploys; smaller enterprise footprint
3Multi-cloud AWS + GCP DRHigh (0.8)Resilience; highest complexity
3

Constraints

Click Next (or Add constraint if you have must-haves).

4

Criteria

NameNotes (optional)Weight
Reliability & SLAUptime and failover posture0.40
Engineering velocityDeploy frequency and lead time0.30
Operational cost18-month run-rate0.20
EU residencyData residency compliance0.10
5

Scores

OptionReliability & SLAEngineering velocityOperational costEU residency
Stay on AWS EKS85706588
Fly.io + managed Postgres75928072
Multi-cloud AWS + GCP DR90555090
6

Assumptions

UI fieldValue
Key assumptionTraffic stays under 50k RPS through 2027.
What would prove you wrong?August load test exceeds 55k RPS sustained.
Best evidenceQ2 capacity planning spreadsheet
Top riskFly.io enterprise support gap — Severity 2 Likelihood 3
7

Review

UI fieldValue
Decision windowCustom… → 18_months
Outcome confidenceModerate (0.6)
Check again in (days)90
What success looks like (optional)No Sev-1 from deployment model before next architecture review.

Example 34 optionsCost ceiling

Office lease

Best for: Encoding must-haves in criteria scores when you skip constraints.

Expected: Renew or East Austin wins; Domain Northside ranks low on Cost.

Draft

FieldValue
Decision typeBusiness strategy
TitleAustin HQ Lease Renewal vs Relocation

Click Start.

1

Goal

UI fieldValue
What are you deciding?Select office arrangement for 45-person HQ from October 2026.
Background (optional)Current lease ends Sept 30. Must seat 50 with hybrid ratio 60/40. Max all-in rent $42k/month is non-negotiable.
Decide by2026-09-01
Decision typebusiness
Governance levelStandard
2

Options

Click Add option twice (4 total).

#NameTrust in scoresNotes (optional)
1Renew Block 180High (0.8)Current building
2Domain NorthsideModerate (0.6)Premium campus; quotes ~$48k
3East Austin flex campusModerate (0.6)Mid-cost flex space
4Full remote + quarterly offsitesLow (0.4)Lowest rent; culture tradeoff
3

Constraints

Click Next (or Add constraint if you have must-haves).

4

Criteria

Click Add criterion once (3 criteria). Score Domain Northside lower on Cost to reflect over-budget rent.

NameNotes (optional)Weight
Employee experienceHybrid workspace quality0.40
CostAll-in monthly cost within $42k cap0.35
Recruiting signalAbility to attract talent0.25
5

Scores

OptionEmployee experienceCostRecruiting signal
Renew Block 180828880
Domain Northside903592
East Austin flex campus788075
Full remote + quarterly offsites659560
6

Assumptions

UI fieldValue
Key assumptionHybrid attendance stays near 60% office.
What would prove you wrong?Quarterly occupancy survey drops below 45%.
Best evidenceBroker proposals May 2026
Top riskRemote-first hurts junior hiring — Severity 3 Likelihood 2
7

Review

UI fieldValue
Decision window1 year
Outcome confidenceModerate (0.6)
Check again in (days)180
What success looks like (optional)Lease signed or remote policy published by Oct 1.

Example 43 optionsRisk in text

Acquire vs build vs partner

Best for: Documenting integration risk in **Top risk**; compare rankings after **Run score**.

Expected: Raw scores may favor Acquire; check risk penalties on the scorecard.

Draft

FieldValue
Decision typeEngineering / build vs buy
TitleAcquire vs Build vs Partner — Customer Support AI

Click Start.

1

Goal

UI fieldValue
What are you deciding?How we deliver Tier-1 support automation by Q1 2027.
Background (optional)Board wants measurable deflection in 9 months. Legal reviewing acquisition path.
Decide by2026-10-01
Decision typeengineering
Governance levelEnterprise
2

Options

Click Add option once (3 total).

#NameTrust in scoresNotes (optional)
1Acquire Startup XModerate (0.6)$8M; strong tech; integration risk
2Build in-houseModerate (0.6)12-month roadmap
3Partner with Zendesk AIHigh (0.8)Faster; less differentiation
3

Constraints

Click Next (or Add constraint if you have must-haves).

4

Criteria

NameNotes (optional)Weight
Strategic fitAlignment with product strategy0.30
Time to marketSpeed to Tier-1 automation0.30
Risk-adjusted ROIReturn after integration risk0.40
5

Scores

OptionStrategic fitTime to marketRisk-adjusted ROI
Acquire Startup X928885
Build in-house754590
Partner with Zendesk AI709572
6

Assumptions

UI fieldValue
Key assumptionStartup X IP is clean for acquisition.
What would prove you wrong?Diligence fails on IP chain of title.
Best evidenceLOI term sheet draft
Top riskAcquire Startup X — integration failure — Severity 5 Likelihood 4
7

Review

UI fieldValue
Decision windowCustom… → 9_months
Outcome confidenceModerate (0.6)
Check again in (days)60
What success looks like (optional)25% ticket deflection in pilot queue.

Example 55 optionsEngineering trade study

API gateway

Best for: Ideal 3–5 option shortlist; fill **Why? (optional)** on close scores.

Draft

FieldValue
Decision typeArchitecture / technical
TitleAPI Gateway Pattern Selection

Click Start.

1

Goal

UI fieldValue
What are you deciding?Standardize edge/API layer for 12 microservices.
Background (optional)Need rate limiting, mTLS, observability, gradual Kong migration off legacy nginx proxy.
Decide by2026-08-15
Decision typearchitecture
Governance levelConsulting
2

Options

Click Add option three times (5 total).

#NameTrust in scoresNotes (optional)
1Kong Gateway EnterpriseHigh (0.8)mTLS + plugins; license cost
2AWS API Gateway + Lambda authorizersHigh (0.8)Managed; vendor lock-in
3Envoy + custom control planeModerate (0.6)Latency win; ops burden
4Apigee XHigh (0.8)Enterprise; long migration
5Keep nginx + LuaVery high (1.0)Status quo; tech debt
3

Constraints

Click Next (or Add constraint if you have must-haves).

4

Criteria

Click Add criterion three times (5 total).

NameNotes (optional)Weight
Security & mTLSEdge security posture0.25
OperabilityDay-2 ops burden0.25
Latency overheadAdded request latency0.20
License / TCO (3 yr)Three-year cost0.20
Team familiarityExisting skills0.10
5

Scores

Fill all 25 cells. Sample rows:

OptionSecurity & mTLSOperabilityLatency overheadLicense / TCOTeam familiarity
Kong Gateway Enterprise8882857075
AWS API Gateway + Lambda authorizers8588827880
Envoy + custom control plane9055928550
Apigee X8660805565
Keep nginx + Lua7092889590

Why? (optional) example: Envoy / Operability → Small SRE team cannot run control plane.

6

Assumptions

UI fieldValue
Key assumptionKong contract renews at current tier.
What would prove you wrong?Renewal quote increases more than 20%.
Best evidenceArchitecture review notes June 2026
Top riskEnvoy path delays migration — Severity 4 Likelihood 3
7

Review

UI fieldValue
Decision window6 months
Outcome confidenceHigh (0.8)
Check again in (days)90
What success looks like (optional)One production service on chosen gateway with SLO met.

Example 62 optionsFast path

Hire FTE vs contractor

Best for: First decision in under 15 minutes; **Standard** governance.

Expected: Contractor wins clearly.

Draft

FieldValue
Decision typeCareer / job
TitleStaff Senior Backend Engineer — H2 2026

Click Start.

1

Goal

UI fieldValue
What are you deciding?Fill one senior backend slot by September 1.
Background (optional)Critical path on billing rewrite. Budget $180k loaded FTE or $120/hr contract cap 6 months.
Decide by2026-07-01
Decision typecareer
Governance levelStandard
2

Options

Use the two default rows (no add/remove).

#NameTrust in scoresNotes (optional)
1Full-time hireModerate (0.6)Long-term capacity; slower start
26-month senior contractorHigh (0.8)Faster start; cap $120/hr
3

Constraints

Click Next (or Add constraint if you have must-haves).

4

Criteria

Use the two default criteria rows.

NameNotes (optional)Weight
Delivery by Nov 1Billing rewrite on schedule0.60
Cost within budgetLoaded FTE vs contract cap0.40
5

Scores

OptionDelivery by Nov 1Cost within budget
Full-time hire6570
6-month senior contractor8875
6

Assumptions

UI fieldValue
Key assumptionBilling rewrite scope stays frozen.
What would prove you wrong?Scope change adds more than 2 weeks slip.
Best evidenceEngineering roadmap v3
Top riskContractor knowledge loss at month 6 — Severity 2 Likelihood 4
7

Review

UI fieldValue
Decision window60 days
Outcome confidenceHigh (0.8)
Check again in (days)60
What success looks like (optional)Billing MVP milestone green by Nov 1.

Example 77 optionsPortfolio pick at ceiling

Portfolio pick at ceiling

Best for: Maximum shortlist; watch the **Shortlist is long** pill on the Options step.

Expected: Clear ranking; check rank stability if scores cluster.

Draft

FieldValue
Decision typeBusiness strategy
TitleH2 2026 Engineering Portfolio — Pick Top Initiative

Click Start.

1

Goal

UI fieldValue
What are you deciding?Select one primary bet for H2 given fixed capacity of 3 squads.
Background (optional)Seven proposals from product council; leadership wants a single board narrative.
Decide by2026-07-20
Decision typebusiness
Governance levelEnterprise
2

Options

Click Add option five times (7 total). You may see Shortlist is long.

#NameTrust in scoresNotes (optional)
1Mobile app v2Moderate (0.6)Consumer growth bet
2Enterprise SSOHigh (0.8)Revenue unlock for F500
3AI copilot betaModerate (0.6)Differentiation; uncertain ROI
4Billing reliabilityHigh (0.8)Reduces churn risk
5Self-serve onboardingHigh (0.8)PLG conversion
6Partner API programHigh (0.8)Ecosystem play
7Data platform modernizationHigh (0.8)Enables all squads
3

Constraints

Click Next (or Add constraint if you have must-haves).

4

Criteria

Click Add criterion twice (4 total).

NameNotes (optional)Weight
Revenue impactNear-term revenue lift0.30
Strategic alignmentBoard narrative fit0.25
Execution confidenceSquad can deliver in H20.25
Risk mitigationDownside if initiative fails0.20
5

Scores

Fill all 28 score cards (7 options × 4 criteria). Sample:

OptionRevenue impactStrategic alignmentExecution confidenceRisk mitigation
Mobile app v278728070
Enterprise SSO85888275
AI copilot beta88905560
Billing reliability82789085
Self-serve onboarding80758572
Partner API program76807870
Data platform modernization84867080
6

Assumptions

UI fieldValue
Key assumptionBoard accepts a single-H2 narrative.
What would prove you wrong?Board requests parallel bet approval.
Best evidenceProduct council ranking June 2026
Top riskAI copilot distracts squads — Severity 3 Likelihood 3
7

Review

UI fieldValue
Decision window6 months
Outcome confidenceModerate (0.6)
Check again in (days)90
What success looks like (optional)One initiative staffed with committed OKRs by Aug 1.

Spectrum cheat sheet

ExampleOptionsTeaches
1 Vendor analytics4Full Genius; clear Accept
2 Cloud deployment3Close call / weak margin
3 Office lease4Must-haves via criteria scores
4 Acquire vs build3Risk in Top risk field
5 API gateway5Ideal shortlist + Why? (optional) notes
6 Hire FTE vs contractor2Fast Standard-tier path
7 Portfolio pick7Max options + Shortlist is long

Quick start (under 20 minutes)

  1. Pick Example 6 (fastest) or Example 1 (richest).
  2. Open /decisions/new and this guide side by side.
  3. Copy each step table into the matching Genius screen.
  4. Save draft anytime; resume from Home → Your drafts.
  5. Run score → review Scorecard → open Brief page → Run critiqueBriefAccept (or Override with rationale).

Common mistakes

MistakeWhat happens
Only 1 criterionValidation fails — use Add criterion (minimum 2)
8+ optionsCannot add — max 7
Missing What would prove you wrong?Weaker assumption check at finalize
Skipping Trust in scoresCannot Run score until each option has confidence set
Unscored criteria cardsRun score blocked — enter Score (0–100) on every option × criterion
Weights ≠ 1.00Run score blocked — watch Total pill